Infrastructure Projects: The Basis Of Modern Development
We are proud to provide Infrastructure projects and support development in communities and cities. Our services include:
- Design and implementation of water, sanitation and fire networks using HDPE pipes.
- Developing integrated irrigation systems.
- Creating sustainable infrastructure for industrial and residential projects.
We rely on the best engineering practices to ensure the quality and longevity of projects.
Network Connection Projects: Connecting the Future
Infrastructure connection projects It is our primary specialty, as we provide advanced solutions to connect systems with high efficiency. Our services include:
- Connecting irrigation networks: Using HDPE pipes to ensure effective water distribution.
- Connecting sewage networks: To transport waste safely and without leakage.
- Installing and connecting internal and external networks for major projects.
Our experience enables us to implement delivery projects accurately and quickly, saving time and costs.
Why Choose United Engineers For Your Projects?
We excel at Infrastructure projects and network connectivity projects thanks to:
- The use of HDPE pipes known for its durability and flexibility.
- A professional engineering team ensures implementation in accordance with international standards.
- Our commitment to sustainability and quality in every project.
At United Engineers, we specialize in implementing infrastructure projects and network connectivity projects using the latest technologies and high-quality HDPE pipes. Whether you are looking for solutions for irrigation networks, sewage systems, or infrastructure development projects, we are here to provide integrated services that ensure efficiency and sustainability. Learn about our experiences in implementing projects that meet the needs of different sectors.
Examples of our Successful Projects
The new Beni Suef Cement project
P | Item | Owner of the Project | Start Date | End Date |
---|---|---|---|---|
1 | The new Beni Suef Cement project: where the company carries out contracting works related to the infrastructure of underground networks for water lines, fire irrigation and drainage, using high-density polyethylene (HDPE) pipes with diameters of 20 to 315 mm using ButtFusion welding in accordance with the Egyptian specifications and code. | Sinoma Chinese company | November 2017 | March 2018 |
P | 1 |
---|---|
Item | The new Beni Suef Cement project: where the company carries out contracting works related to the infrastructure of underground networks for water lines, fire irrigation and drainage, using high-density polyethylene (HDPE) pipes with diameters of 20 to 315 mm using ButtFusion welding in accordance with the Egyptian specifications and code. |
Owner of the Project | Sinoma Chinese company |
Start Date | November 2017 |
End Date | March 2018 |
Gardenia project in Zahraa, Nasr City
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
2 | Gardenia project in Zahraa, Nasr City: The company carries out contracting works for the infrastructure of ground networks for the fire line, using high-density polyethylene (HDPE) pipes with diameters of 200, 160, and 110 mm using Butt Fusion welding in accordance with the Egyptian specifications and code. | Al-Imam General Contracting Company | October 2017 | December 2018 |
P | 2 |
---|---|
Item | Gardenia project in Zahraa, Nasr City: The company carries out contracting works for the infrastructure of ground networks for the fire line, using high-density polyethylene (HDPE) pipes with diameters of 200, 160, and 110 mm using Butt Fusion welding in accordance with the Egyptian specifications and code. |
Under Supervision | Al-Imam General Contracting Company |
Start Date | October 2017 |
End Date | December 2018 |
Mall of Choueifat in the Fifth Settlement
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
3 | Mall of Choueifat in the Fifth Settlement: where the company carries out contracting works related to the infrastructure of ground networks for the fire line, using high-density polyethylene (HDPE) pipes with diameters of 200, 160, and 110 mm by using Butt Fusion welding in accordance with the Egyptian specifications and code. | Al-Imam General Contracting Company | March 2017 | February 2018 |
P | 3 |
---|---|
Item | Mall of Choueifat in the Fifth Settlement: where the company carries out contracting works related to the infrastructure of ground networks for the fire line, using high-density polyethylene (HDPE) pipes with diameters of 200, 160, and 110 mm by using Butt Fusion welding in accordance with the Egyptian specifications and code. |
Under Supervision | Al-Imam General Contracting Company |
Start Date | March 2017 |
End Date | February 2018 |
The New Administrative Capital
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
4 | The New Administrative Capital: The company carried out contracting works for the infrastructure of underground networks for drinking water, irrigation and fire lines, using high-density polyethylene (HDPE) pipes using Butt Fusion welding in accordance with the Egyptian specifications and code. | Medcom General Contracting Company | August 2016 | March 2017 |
P | 4 |
---|---|
Item | The New Administrative Capital: The company carried out contracting works for the infrastructure of underground networks for drinking water, irrigation and fire lines, using high-density polyethylene (HDPE) pipes using Butt Fusion welding in accordance with the Egyptian specifications and code. |
Under Supervision | Medcom General Contracting Company |
Start Date | August 2016 |
End Date | March 2017 |
The New Administrative Capital (Al-Massa Hotel)
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
5 | The New Administrative Capital (Al-Massa Hotel): The company carried out contracting works related to sanitary works using HDPE pipes and P.P. pipes in accordance with the Egyptian specifications and code. | Orascom Construction Company | October 2016 | January 2017 |
P | 5 |
---|---|
Item | The New Administrative Capital (Al-Massa Hotel): The company carried out contracting works related to sanitary works using HDPE pipes and P.P. pipes in accordance with the Egyptian specifications and code. |
Under Supervision | Orascom Construction Company |
Start Date | October 2016 |
End Date | January 2017 |
Zewail University of Science and Technology
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
6 | Zewail University of Science and Technology: The company carries out contracting work on the water lines of the power station using high-density polyethylene (HDPE) pipes in accordance with the Egyptian specifications and code. | Siemens company | February 2017 | March 2018 |
P | 6 |
---|---|
Item | Zewail University of Science and Technology: The company carries out contracting work on the water lines of the power station using high-density polyethylene (HDPE) pipes in accordance with the Egyptian specifications and code. |
Under Supervision | Siemens company |
Start Date | February 2017 |
End Date | March 2018 |
Zewail City
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
7 | Zewail University of Science and Technology: The company carried out contracting works for the infrastructure of underground networks for drinking water, irrigation, fire, and sewage lines, using high-density polyethylene (HDPE) and (UPVC) pipes, while carrying out the necessary tests in accordance with the Egyptian specifications and code. | Amlak General Contracting Company | February 2016 | January 2017 |
P | 7 |
---|---|
Item | Zewail University of Science and Technology: The company carried out contracting works for the infrastructure of underground networks for drinking water, irrigation, fire, and sewage lines, using high-density polyethylene (HDPE) and (UPVC) pipes, while carrying out the necessary tests in accordance with the Egyptian specifications and code. |
Under Supervision | Amlak General Contracting Company |
Start Date | February 2016 |
End Date | January 2017 |
Furniture City in New Damietta
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
8 | Furniture City in New Damietta: The company carried out contracting works for the infrastructure of underground networks for drinking water, irrigation, fire and sewage lines, using high-density polyethylene (HDPE) pipes. | Hassan Allam Sons Company | May 2018 | February 2019 |
P | 8 |
---|---|
Item | Furniture City in New Damietta: The company carried out contracting works for the infrastructure of underground networks for drinking water, irrigation, fire and sewage lines, using high-density polyethylene (HDPE) pipes. |
Under Supervision | Hassan Allam Sons Company |
Start Date | May 2018 |
End Date | February 2019 |
Galala Resort in Ain Sokhna
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
9 | Galala Resort in Ain Sokhna: The company supplied and installed contracting works related to the infrastructure of underground networks for drinking water, irrigation, fire, and sewage lines, using high-density polyethylene (HDPE) and (UPVC) pipes, while carrying out the necessary tests in accordance with the specifications and the Egyptian code. | Hassan Allam Sons Company | October 2018 | February 2022 |
P | 9 |
---|---|
Item | Galala Resort in Ain Sokhna: The company supplied and installed contracting works related to the infrastructure of underground networks for drinking water, irrigation, fire, and sewage lines, using high-density polyethylene (HDPE) and (UPVC) pipes, while carrying out the necessary tests in accordance with the specifications and the Egyptian code. |
Under Supervision | Hassan Allam Sons Company |
Start Date | October 2018 |
End Date | February 2022 |
Superior Sewage Treatment Station
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
10 | Superior sewage treatment station: The company carried out the line work for a sewage treatment station, using high-density polyethylene (HDPE) pipes. | Sol Water Water Treatment and Environmental Technology Company | January 2022 | June 2022 |
P | 10 |
---|---|
Item | Superior sewage treatment station: The company carried out the line work for a sewage treatment station, using high-density polyethylene (HDPE) pipes. |
Under Supervision | Sol Water Water Treatment and Environmental Technology Company |
Start Date | January 2022 |
End Date | June 2022 |
Midtown Solo Compound (Administrative Capital)
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
11 | Midtown Solo Compound (Administrative Capital): The company carried out contracting work for the infrastructure of underground networks for drinking water, irrigation, and fire lines, using high-density polyethylene (HDPE) pipes. | Al-Shorouk Company for General Contracting and Supplies | April 2022 | February 2023 |
P | 11 |
---|---|
Item | Midtown Solo Compound (Administrative Capital): The company carried out contracting work for the infrastructure of underground networks for drinking water, irrigation, and fire lines, using high-density polyethylene (HDPE) pipes. |
Under Supervision | Al-Shorouk Company for General Contracting and Supplies |
Start Date | April 2022 |
End Date | February 2023 |
Sharm El Sheikh (100 Million Trees Project)
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
12 | An advanced irrigation network on the Ring Road, Sharm El Sheikh (100 Million Trees Project): The company carried out the contracting work for the infrastructure of underground networks for irrigation lines, using high-density polyethylene (HDPE) pipes. | Royal Design Building and Construction Company | September 2022 | September 2024 |
P | 12 |
---|---|
Item | An advanced irrigation network on the Ring Road, Sharm El Sheikh (100 Million Trees Project): The company carried out the contracting work for the infrastructure of underground networks for irrigation lines, using high-density polyethylene (HDPE) pipes. |
Under Supervision | Royal Design Building and Construction Company |
Start Date | September 2022 |
End Date | September 2024 |
Sea Shell Village, North Coast
P | Item | Under Supervision | Start Date | End Date |
---|---|---|---|---|
13 | Sea Shell Village, North Coast: Where the company carried out contracting works for the infrastructure of underground networks for drinking water, irrigation, and fire lines, using high-density polyethylene (HDPE) pipes. | Fountana Egy Company for Electromechanical Works | February 2023 | June 2024 |
P | 13 |
---|---|
Item | Sea Shell Village, North Coast: Where the company carried out contracting works for the infrastructure of underground networks for drinking water, irrigation, and fire lines, using high-density polyethylene (HDPE) pipes. |
Under Supervision | Fountana Egy Company for Electromechanical Works |
Start Date | February 2023 |
End Date | June 2024 |
Contact Us To Start Your Project
Are you planning Infrastructure projects or Network connectivity projects؟ Contact us today for a consultation and start turning your vision into reality. We are your reliable partner for successful and sustainable projects!